|
How long does it take to get price estimates?
How long does it take to have new signs fabricated
and installed, after placing an order?
What geographic area does Graphic Image
Signs serve?
Q: How long does it take to get price estimates?
A: The more information you can provide us, the faster
and more accurately we can prepare
estimates. If a site visit and survey is
required, allow a few days. Otherwise, quotations can
generally be prepared in one to three days.
Back to
Top
Q: How long does it take to have new signs fabricated and installed, after placing an order?
A: For permanent signage, such as monument signs or lighted
identification signs, average time required is approximately 4-6 weeks
after ordering. Most other signs require only 1-2 weeks. Time may
vary according to complexity and size of order.
Back to
Top
Q: What geographic area does
Graphic Image Signs serve?
A: Our primary service area is the DFW Metroplex, and any
location in Texas. However, we ship and arrange for installation of our
signs throughout the U.S.
Back to
Top
|